Technical Details
• Technology: Fixed-tilt solar PV structures
• Capacity: 285 MWp
• Estimated production: ~ 425 GWh/y
• Powering up to 120,000 Montenegrin homes with clean energy
Korita project is being developed by European Energy and a local development partner in Bijelo Polje municipality. This region has an optimal solar resource located on the north-eastern side of Montenegro, next to the border with Serbia.
This project is in a late development phase, with the planned installed capacity of 285MWp. The total project area is 506 hectares, with a substantial portion allocated to solar PV panel installation. A portion of the space will be designated for service access and to maintain a safe distance from the outer fence perimeter. The remaining land will be considered for multiple use, some of which could be for agricultural activities and the grazing of farm animals.
The Korita Solar Park will be in place for a period of 40 years, after which the land will be restored back to its previous state.
Ultimately, the development of this project will provide a reliable and sustainable source of renewable energy, playing an important role in the gradual decarbonization of industry. By reducing greenhouse gas emissions by an estimated 240,582 tons of CO₂ annually, the project supports the Montenegro’s commitment to a cleaner environment. It will also enhance the security and stability of the country’s energy supply by diversifying energy sources and reducing fossil fuel dependency.
Solar panels transform sunlight into electricity using silicon cells. When sunlight hits these cells, the electrons in the cells vibrate and this creates a DC (Direct Current) electric current that turns into AC (Alternating Current). AC is more efficient for sending power over long distances and can easily be adjusted using transformers, reducing energy loss. The solar inverter then does its job, turning this DC electricity into electricity that can be used right away, stored in batteries, or sent back to the grid. It is a process that helps us tap into the sun’s power for a cleaner and more sustainable energy source.
Construction will take 18-24 months, and we will keep local stakeholders informed of progress.
The potential noise from the solar park can come from the construction phase, the decommissioning phase, and from technical installations such as transformers. We would expect that noise impact will be minimal and kept within the normal site working hours during the construction and decommissioning period.
An operational solar park consists of various components that all have different noise characteristics. To minimise or avoid the potential disturbance from the noise made by the technical installations, they are placed with careful consideration from the neighbours. Where necessary, alternative technical solutions will be implemented to mitigate noise.
Solar cells are not dangerous to humans and animals. As part of our efforts to explore opportunities for the multi-use of land associated with our solar parks, we even have sheep that live at some of our solar parks in different countries, where they can, among other things, seek shelter from the rain under the solar panels.
European Energy has performed several detailed studies on the actual components and materials used in manufacturing the solar panels, and there is no indication that PFAS or other chemical substances of this type are present in the panel.
There is no reason to assume negative environmental impacts after a storm. Under extreme cyclone events, some panels might fly away and break while falling to the ground, but even if they might not be re-collected immediately, there is no risk of contamination leaking or washing off the broken panel. There is nothing inside which potentially can contaminate, and even dedicated ground-water protection areas should be free of contamination risk.
European Energy does have reports covering the risk of contamination in relation to e.g., storm and fire, and is planning to conduct further experimental verification of the lack of environmental risk factors.
Climate change is one of the main drivers of the loss of biodiversity. Thus, it is crucial to build renewable energy projects to reduce CO2 emissions and minimise the impact on biodiversity. Locally, biodiversity can be improved through detailed planning, eliminating the use of pesticides and fertilisers, and implementing initiatives that support biodiversity. The potential for positive effects will be highest in areas with degraded biodiversity.
At European Energy, we prioritise initiatives that improve local biodiversity and overall nature values on and around our project sites. Wherever our solar parks replace conventional farming, they eliminate the use of fertilisers and pesticides, thereby having a positive effect on biodiversity, as well as the ground water, streams, and lakes in the area.
Solar PV parks require very little maintenance. Typically, only a few visits per year from a small maintenance team are needed to ensure everything is functioning properly.
The best way to get in touch with us is through the project’s email address info-eebalkans@europeanenergy.com
If you would like to inquire about the project, you are welcome to reach out to us with any questions or thoughts you may have—whether it is about specific areas of interest, updates on our progress, key milestones, or the overall timeline. We are here to provide insights and keep you informed on every step of the project.
We are also open to receiving grievances on anything that negatively affects people or the environment. It could be unfair or unsafe working conditions, impacts on communities or consumers, or pollution and environmental degradation.
We encourage you to speak up about any harm caused by us or our business partners, whether it is affecting workers, communities, or the environment.
We appreciate your effort in helping us maintain responsible and safe operations.
WHY SHOULD YOU CONTACT US?
European Energy believes that engaging with local communities is essential throughout all the phases of our projects. From an early stage, we cooperate with municipalities and other local authorities. We also manage various process to proactively inform and engage with local communities on matters relating to developments in the project.
Anyone can contact us, but especially if you:
HOW CAN YOU CONTACT US?
Follow the instructions in the Form below and you will receive a response within 7 working days.